23 de diciembre de 2023
Kenia,10MW 10sets distribuido ESS gabinete
Tiempo : 2023.12
Ubicación : Kenya
Power Capacity :10MW
The project is located in Kisumu, Kenya. Due to the instability and intermittent fluctuations of the power system in the area, 20 of our distributed energy storage system (ESS) cabinets were used. The entire project took 13 months and achieved the ability to balance grid load fluctuations, reduce peak-to-valley differences, and quickly restore power supply.